• AI for Requirements Traceability, Tram Grade Separation Alliance, Adelaide

    |

    AI for Requirements Traceability, Tram Grade Separation Alliance, Adelaide


  • |

    Western Sydney Airport Canine Facilities and Command Centre ECI Phase

  • |

    PC-24 Business Jet, Reliability and Safety Analysis

  • |

    Western Sydney Airport Canine Facilities and Command Centre D & C Phase


  • Mastering System Architectures For Infrastructure Projects

    Mastering System Architectures For Infrastructure Projects

    Overmorrow Consulting was appointed as the Systems Engineering & Assurance Manager for the design and construction of the Pitt Street integrated station development.

    /

  • Sydney Metro Pitt Street Station, Systems Engineering & Assurance

    Sydney Metro Pitt Street Station, Systems Engineering & Assurance

    Overmorrow Consulting was appointed as the Systems Engineering & Assurance Manager for the design and construction of the Pitt Street integrated station development.

    /

  • Great Western Highway Upgrade Program

    Great Western Highway Upgrade Program

    Overmorrow is supporting TfNSW on the Great Western Highway Upgrade Program.  The Great Western Highway is one of Australia’s most historic roads and a key east-west connection out of Sydney.  The Great Western Highway from Katoomba to Lithgow will be duplicated over 10 years, a project that complete the final 34 kilometres of a modern…

    /

  • Van Oord Marine Contractors “Founding the Future” Organisational Improvement Programme

    Van Oord Marine Contractors “Founding the Future” Organisational Improvement Programme

    Founding the Future is an organisational improvement programme that aims to improve Van Oord’s scope management, cost engineering and integrated project control by creating a consistent way of working, closing the loop and creating a data-driven decision-making process and culture. Overmorrow is supporting Van Oord in this program by integrating Systems Engineering in Van Oord’s…

    /

  • Surface Civil and Alignment Works (SCAW)

    Surface Civil and Alignment Works (SCAW)

    Overmorrow Consulting is supporting the Joint Venture between CPB Contractors and United Infrastructure with project management and implementation of Relatics software for the Surface Civil and Alignment Works for the Sydney Metro – Western Sydney Airport rail link between Orchard Hills and the new Western Sydney Airport Station. The project will deliver approximately 10.4 kilometres…

    /

  • ITSLiFe Lifecycle Framework Development

    ITSLiFe Lifecycle Framework Development

    Overmorrow played a key role as part of a tailored team of experienced professionals, contributing extensive Systems Engineering knowledge and innovative concepts to the development of the framework. This collaborative effort has resulted in a robust and effective lifecycle management system tailored to the specific needs of road operations in Queensland. ITSLiFe is a comprehensive…

    /

  • Western Sydney Airport SSTOM Tender

    Western Sydney Airport SSTOM Tender

    The Western Sydney Airport Line will see a new Metro rail line run from St Marys on the existing T1 heavy rail line to the Western Sydney Aerotropolis near Bringelly, via Western Sydney Airport (WSA). The scope of the SSTOM (Stations, Systems, Trains, Operations and Maintenance) package includes the build of six new metro stations…

    /

  • Digital Systems Program, TfNSW

    Digital Systems Program, TfNSW

    Overmorrow supported Transport for NSW (TfNSW) by providing expertise in Functional Hazard Analysis, Functional Safety Assessment, and Safety Assurance. These contributions were critical in ensuring that the new systems met rigorous safety standards and operated reliably within the upgraded network. The Digital Systems Program will replace current signalling and train control technology with modern intelligent…

    /

  • D328eco – Single engine Electrical Power System, Reliability and Safety Analysis

    D328eco – Single engine Electrical Power System, Reliability and Safety Analysis

    Overmorrow Consulting was appointed as the Systems Engineering & Assurance Manager for the design and construction of the Pitt Street integrated station development.

    /