-

AIR5428 – RAAF PC-21 , Management and Safety assurance
Overmorrow Consulting was appointed as the Systems Engineering & Assurance Manager for the design and construction of the Pitt Street integrated station development.
/
-

Coffs Harbour Bypass
Overmorrow’s role involved providing client-side configuration management services. This includes a comprehensive review of Systems Engineering, Functional Safety, Safety in Design, and Reliability, Availability, and Maintainability (RAM) Analysis. Overmorrow’s expertise ensures that these critical aspects are thoroughly evaluated and integrated, supporting the successful delivery of the project with high standards of safety, reliability, and efficiency.…
/
-

Inland Rail Civil Works Program – South (N2N)
Overmorrow Consulting is supporting the ACACPB Joint Venture on the Inland Rail Civil Works Program – South Narromine to Narrabri. The Australian Government’s Australian Rail Track Corporation selected the ACACPB Joint Venture, a 50-50 joint venture formed by CPB Contractors and ACCIONA Construction Australia, under a Collaborative Framework Agreement (CFA). The civil works involved include…
/
-

Randstad 380kV South Ring Transmission line Wateringen-Bleiswijk
TenneT’s Randstad 380kV project consists of the realization of a new 380kV high-voltage connection between Wateringen, Bleiswijk, Vijfhuizen and Beverwijk. The new routes to be built must form a north and south ring together with existing high-voltage connections. BAM was responsible for the design and construction of the South ring between Wateringen and Bleiswijk. Our…
/
-

380kV Substation Diemen Omexom for TenneT
The works on the Diemen 380kV substation involved a new transformer field, a coil field with a modern, new power transformer and a reactive current compensation coil. The new field is also connected underground to the existing 150kV field. Omexon was responsible for engineering, construction, testing and commissioning. Our staff was engaged in the delivery…
/
-

Wintrack II 380kV Transmission towers and lines for Engie Fabricom Belgium / TenneT
Wintrack responds to social and technological developments and makes it possible to make optimal use of the available space in the area. The steel Wintrack masts provide a solid and robust solution for high voltage power transmission with an eye for the environment and society. Wintracks masts are sleekly designed masts that are discreetly visible…
/
-

Swan Hill Bridge Replacement
Overmorrow provided comprehensive System and Safety Assurance Management, including the review of Reliability, Availability, and Maintainability (RAM) documentation and contributions to the business and system requirements concerning RAM and safety issues. This involvement ensures that the new bridge meets stringent standards for operational performance and safety, supporting long-term sustainability and efficiency. Swan Hill (Victoria) is…
/
-

Offshore Wind Farm “Deutsche Bucht”
Deutsche Bucht is a 252-MW offshore wind farm in the German North Sea and consists of 31 turbines became with a capacity of 8.4MW each. Located off the island of Borkum in the German Exclusive Economic Zone, the wind farm is expected to generate around one billion kWh of electricity per year, or enough to…
/
-

Kopter AW09 – Single engine, Maintainability Analysis
Overmorrow Consulting was appointed as the Systems Engineering & Assurance Manager for the design and construction of the Pitt Street integrated station development.
/

