The works on the Diemen 380kV substation involved a new transformer field, a coil field with a modern, new power transformer and a reactive current compensation coil. The new field is also connected underground to the existing 150kV field. Omexon was responsible for engineering, construction, testing and commissioning.
Our staff was engaged in the delivery of the 380kV Substation in Diemen by Omexom NL. Services included developing Asset Breakdown Structures with functional and physical perspectives for use in Design, Construction, Operation and Maintenance; managing the specification of requirements and facilitating verification by the project team; and facilitating and tailoring Relatics tooling.